One third portion of the sump tank concreting complete
Footing Work
Footing Work
Footing Concreting
Sumptank base slab Concreting
Plinth beam work of the foundation in progress
Ground floor Column Concreting
Sump Tank Top slab which is all so the base slab for the Ground floor Steel work
One third portion of the sump tank concreting complete
First Floor Slab Shattering over the completed area of the sump tank
Ground Floor Roof Steel Work
1st Floor Roof Concreting
1st Floor Roof Steel Work
2nd Floor Roof Shattering
3rd Floor Shattering and steel work
Front View 1
Front View
Side View
5
th
Floor Steel Work
5
th
Floor Shattering Work
Side Elevation